Dear Pastor,

Calvary greetings in the unconditional love of our Lord and Savior Jesus Christ who alone is the hope of this world. God is still good all the time. I’ve received a mail from International Gospel Missions requesting me to furnish the church with the full cost to complete the above project. I truly appreciate your prayers and financial contributions all the time.

We’re very grateful for all your willingness and thoughtfulness to help support this project.

Please, find below a breakdown of what’s now required to complete the building project. The total does not include fixtures and equipments needed to run the place.

First Floor (residential for the orphans and Street girls

1. Tiling of floors including toilets and bathrooms : $6,750
2. Plumbing works. :$3,700
3. Kitchen cabinets and Bathroom :$7,830
4. Sliding windows and Doors (steel for protection against armed robbery): $5,230
5. Outside plastering : $3,200
6. Painting: $3,890
7. Electrical works: $5,610
8. Outside floor and railing: $1,320

Dressmaking/ Handcraft section

1. Flooring and tiling: $3,470
2. Sliding windows with burglar proof: $2,270
3. Doors (one steel and one wooden) $920
4. Masonry and complete block work: $2,710
5. Electricals ( industrial cables included for machines) : $3,490

Second Floor (residential)

1. Staircase finishing with railings : $2,410
2. Tiling of floor, kitchen and bathrooms: $7,800
3. Plumbing: $4,500
4. Kitchen/ Bathrooms: $7,830
5. Painting of inside and outside: $5,890
6. Electrical installations: $ 6,610
7. Inside wall plastering: $2,200
8, Outside wall plastering: $ 3,970
9. Railings: $2,170
10. Sliding Windows and Doors with burglar proof: $4,370
11: Floor work: $2,760

Beauty Section

1. Floor work and tiling: $3,992
2. Sliding windows with burglar proof: $1,700
3. Doors (one Steele one wooden): $920
4. Electrical installations (including industrial cables for Hair Dryers): $3,865
5. Block and concrete work: $3,985

Third Floor (residential)

1. Steele Trusses: $6,330
2. Roofing: $5,560
3. Rooms construction ( block work): $6,710
4. Iron rods: $3,840
5, Railings: $2,800
6, Floor work and Tiling: $6,750
7. Plumbing works: 5,600
8, Kitchen/ Bathrooms: $7,850
9. Windows with burglar proof and Doors: $4,110
10. Outside walls plastering: $4,050
11. Inside walls plastering: $2,800
12. Painting: $5,100
13. Electrical installation: $6,210
14. Staircase finishing: $2,570
15. Carpentry work and materials: $6,805

Cooking and Pastry (Home Economics)

1. Block and concrete work: $4,600
2. Floor work and tiling: $3,120
3. Sliding windows with burglar proof and doors: $4,750
4. Electrical installations: $4,600
5. Painting: $ 2,150

Other costs

Fire escape stairs: $6,000
Foreman payment: $3,000
Miscellaneous: $3,000

Material costs and labor are included in all costs

Please, kindly let me know if there are any questions or need clarification on any issues.

Once again, I want to thank you for your interest.

Thank you.

Still praising the Lord,
Pastor Alex B